Why it matters

Compliance is what makes the shot possible.

Most of what makes an aerial sequence possible is settled before an engine starts. Kevin handles the regulatory side directly: the waivers, the filming manual, the coordination with the FAA and the approvals that let a production fly lower, closer and over locations that would otherwise be off-limits.

That work is why the team can operate at the level it does. When compliance is planned in from the start, directors can design the shot they actually want, and the crew can fly it legally and safely.

02
Clearance sequence
FLIGHT PLAN · REGULATORY CLEARANCECLEARED
  1. CLR 01

    Scope the sequence

    Review what the director wants to fly: the aircraft, altitudes, locations and distance from people, vehicles and structures. That defines which rules apply.

    ✓ Cleared
  2. CLR 02

    Establish the operating authority

    Flights below standard minimum altitudes, including over congested areas, are conducted under an FAA-approved Motion Picture and Television Filming Manual (MPTFOM) and the associated certificate of waiver to 14 CFR 91.119, with Part 119 certificate requirements applied where they are relevant.

    ✓ Cleared
  3. CLR 03

    Coordinate with the local FSDO

    The plan is coordinated with the Flight Standards District Office responsible for the area, so the operation is understood and agreed before the shoot day.

    ✓ Cleared
  4. CLR 04

    Coordinate the airspace

    Airspace is coordinated with air traffic control and the relevant authorities. International work follows ICAO guidance and the local aviation authority.

    ✓ Cleared
  5. CLR 05

    Sign off the equipment

    Every externally mounted gimbal is inspected and signed off by an FAA-certificated A&P mechanic before and after each production.

    ✓ Cleared
  6. CLR 06

    Brief and fly the plan

    Crews are briefed on the approved plan, limits and abort criteria, and the sequence is flown as cleared.

    ✓ Cleared
Applicable rules vary by location and operation · Reviewed for each production
03
Authorities
// ATC flight strips · coordinating authorities
STRIP 01FAA
AUTHORITYFederal Aviation Administration
SCOPECoordination on every project
USA● ACTIVE
STRIP 02ICAO
AUTHORITYInternational Civil Aviation Organization
SCOPEGlobal compliance, whenever a project requires it
INTL● ACTIVE
STRIP 03FSDO
AUTHORITYLocal Flight Standards District Office
SCOPESafe, efficient project execution
LOCAL● ACTIVE